CPC expansion project – Kazakhstan section. Procurement and construction of external power supply facilities required for PS in RoK.

              

Realization period

2011 -2013.

Project geography

Atyrau region

Client

“CASPIAN PIPELINE CONSORTIUM-K” JSC

General description of the project

Caspian Pipeline Consortium (CPC) – the largest international oil transport project with participation of Republic of Kazakhstan and Russian Federation, and also the leading world oil-extracting companies, among which are "Chevron", "ExxonMobil", "Eni", "British Gas", "Rosneft", "Lukoil". The project has been created for construction and operation of the main pipeline of more than 1,5 thousand km length (including 452 km on Kazakhstan’s territory), which connects Western Kazakhstan oil field (Tengiz, Karachaganak) with Russian coast of Black Sea (“Southern Ozereevka” terminal close to Novorossiysk), where oil proceeds further to the world markets.

CPC expansion project started in 2011 and its purpose is to increase mechanical capacity of CPC main pipeline from 28 mln to 67 mln tone of raw oil a year. This is the second stage of pipeline expansion which originally was technically and economically proved taking into account further increase of extracted oil volumes for Kazakhstan to Russia delivery.

The result of modernization and expansion of the project shall be increase of oil pipeline mechanical capacity in more than two times due to construction of new production facilities. Kazakhstan being part of a project includes part of pipeline system from Tengiz to Russian Federation border.

Description of projects works realized by “Promstroy-Energo” company

“Promstroy-Energo” company is a contractor responsible for procurement and construction of external power supply facilities required for PS on Kazakhstan territory.

The following scope of “Promstroy-Energo” works within the project:

  • Reconstruction of Tengiz SS 110/10kV (works have been completed in December 2012)
  • Expansion of Atyrau SS 220/110/10kV (works to be completed In May 2013)
  • Construction of OHTL-10kV, 5,7 km length
  • Construction of two chained OHTL-220kV, 444km length
  • Construction of a new A-PS-3A SS 220/10kV as per the scheme 220-4H
  • Construction of a new A-PS-4 SS 220/10kV as per the scheme 220-4H

For qualitative completion of works “Promstroy-Energo” company has significantly renewed its transport and equipment base. More than 80 units of modern equipment have been purchased for the project from leading Russian and Chinese construction equipment and technic manufacturers: lifting cranes – 7 units, crew buses – 6 units, excavators – 2 untis, crane manipulators – 3 units, and also heavy cars, water tank trucks, bulldozers, fuel tank trucks, sewage pipe cleaners etc.

Equipment used on the project and assembled for construction of power supply facilities by “Promstroy-Energo” is known and well recommended on power world market – products of such German brands as “Siemens” and “Alstom”. OHTL support structures are high qualitative products with application of hot galvanisation technology of Donetsk steel plant. Kazakh production is represented as reinforced concrete structures produced in Uralsk, Aktobe, Taldykurgan and Atyrau.

More than 400 people of “Promstroy-Energo” company participate in the project realization: two shifts of technical personnel of 130-140 person consisting of operators, drivers and direct man power and also head office and Atyrau branch personnel

A specific feature of the project is strict compliance with safety rules and Kazakhstan safety standard legislation. Numerous personnel of all the companies involved in the project as well as our personnel undertake “Incident and Injury Free” program. Besides, there is constant training on additional special courses for personnel qualification improvement: safety driving for drivers, working with lifting mechanisms and pressure tanks – for personnel who deal with equipment etc.    “Promstroy-Energo” company’s personnel are being highly appreciated by safety project managers for their high level of knowledge and practical skills applied on a daily production work.

“Promstroy-Energo” participation in the CPC expansion project is especially significant for our company as firstly it objectively proves our leading position on a national electric power industry market and high level of performed works and also promotes the status of our company to international project level.  Besides, project incorporates new international quality standards in to our work and allows expanding our experience and use it in a new for us oil production area.