Project name
Construction of PTL 500 kV SS 1150 Ekibastuzskaya – SS 500 kV Semei –SS 500 kV Ust – Kamenagorsk
Realization period
2013 - 2017
Project geography
Pavlodarskaya and Vostochno-Kazakhstanskaya areas, Republic of Kazakhstan
Client
“KEGOC” JSC
General description of the project
Missions and tasks of the project:
1) Providing the reliable power supply of consumers East Kazakhstan region at the maximum deficiencies (in hours of a winter minimum, at decrease in delivery of Bukhtarminsky hydroelectric power station and Shulbinsky hydroelectric power station to 0 as a result of participation of station in regulation);
2) Decrease in dependence of a covering of deficiencies of power of the East Kazakhstan region on the Russian Federation.
Components of the project Construction of 500 kV provide the following volumes of construction:
500 kV SS Ekibastuz – SS Semei with total length 405.5 km;
PTL 500 Kv SS Semei – SS Ust-Kamenagorsk with total length 192.9 km;
|